The 1.5 million-ton-per-year Gen6 mine in Red River Parish produces both 40/70 and 100 mesh Red River White sand. Because Red River Parish is in the core of the Haynesville Shale, we deliver significant cost savings by eliminating the need to ship sand by train and significantly reducing trucking costs. It is estimated that using Gen6 in-basin frac sand can save up to $180,000 per well in trucking costs and $750,000 per well in rail or barging cost.
Gen6 Mine Quick Facts
$90,000
Estimated average per-well trucking savings
$750,000
Estimated average per well rail or barge savings
32,000 tons
Storage capacity
1,000 acres
Footprint in Red River Parish, 100% Gen6 owned
72,000,000 tons
Estimated reserves
1,500,000 tons
Annual mining capacity
Red River White
Our Red River White meets the API standards for fracing with K factor resistance comparable to Northern White sand.
Crush Strength: 40/70 | 7K |
Crush Strength: 100 mesh | 8K |
Turbidity | <100 NTU |
Krumbein Roundness | 0.8 |
Krumbein Sphericity | 0.6 |